Night Paving Work – Hwy 219 At Willamette River Bridge, St. Paul. Expect Delays.

An overnight paving project has begun on Hwy 219 between St. Paul and Newberg.  Crews are paving the Willamette River bridge and approaches. Traffic is one lane only and being controlled by flaggers and a pilot car.  Lots of heavy equipment on the project with dump trucks coming and going.

Expect delays of 5 to 15 minutes and congested traffic.